1. School of Civil Engineering, Shijiazhuang Tiedao University, Shijiazhuang 050043, China; 2. Department of Preparatory Construction for Hebei Province Shi'an Reconstruction & Extension Expressway, Xingtai 054004, China; 3. Department of Preparatory Construction for Hebei Province Jingshi Reconstruction & Extension Expressway, Baoding 071051, China |
|
|
Abstract The causes, control methods and standards for uncoordinated deformation between new and old subgrades in highway reconstruction and extension projects are analyzed. According to the typical test section of Shijiazhuang to Cixian (demarcation line between Hebei Province and Henan Province) reconstruction and extension project of Beijing-Hongkong- Macao Highway, a finite element model for subgrade widening of highways is established. The additional settlement and horizontal displacement of ground surface as well as transverse slope ratio of pavement are analyzed during the construction period of new subgrade and after construction of 15 years. The geogrid-reinforced technology for the new subgrade is used in this project. The geogrid modulus, reinforced layers and reinforcement length are changed during calculation. The effects of these parameters on surface settlement of the subgrade and transverse slope ratio of pavement are studied. Based on the computational results, the optimization design technology of geogrid-reinforced subgrade widening for highways is presented. The test results can be used as a reference for future studies and design of geogrid-reinforced subgrade in highway reconstruction and extension projects.
|
Received: 28 April 2012
|
|
|
|
|
[1] 刘志明. 沈大高速公路改扩建工程技术论文集[M]. 北京:人民交通出版社, 2005.LIU Zhi-ming. The papers of Shenyang-Dalian highway reconstruction and extension project technical[M]. Beijing: People's Traffic Press, 2005. (in Chinese) [2] 周志刚,郑健龙,李 强. 土工格网处理填挖交界路基非均匀沉降的机理分析[J]. 岩土工程学报, 2002,245:576-579. ZHOU Zhi-gang, ZHEN Jian-long, LI Qiang. Analysis of the mechanism of using geonets to treat the unequal settlement of subgrade at the cut to fill location[J]. Chinese Journal of Geotechnical Engineering, 2002, 245 [3] 黎志光. 高速公路加宽扩建工程新老路衔接的处理措施[J]. 广东公路交通, 20012:9-10. LI Zhi-guang. Highway expansion project of old new widened on processing measures[J]. Guangdong Highway Traffic, 20012: 9-10. (in Chinese) [4] 孙四平,侯 芸,郭忠印. 老路加宽综合方案设计的几点考虑[J]. 华东公路, 2002,565:7-10. SUN Si-ping, HOU Yun, GUO Zhong-yin. Comprehensive scheme design of old widened some consideration[J]. East China Highway, 2002, 565: 7-10. (in Chinese) [5] 晏 莉,阳军生,高燕希,等. 土工合成材料处治老路路基拓宽的数值分析[J]. 岩土工程学报, 2006,2512:1670-1675. YAN Li, YANG Jun-sheng, GAO Yan-xi, et al. Nunerical analysis of geosythetics treatment in old road widening[J]. Chinese Journal of Geotechnical Engineering, 2006, 2512 [6] 贾 宁,陈仁朋. 杭甬高速公路加宽工程理论分析及监测[J]. 岩土工程学报, 2004,266:756-760. JIA Ning, CHEN Ren-peng. Theoretical analysis and measurement for widening project of HangYong Expressway[J]. Chinese Journal of Geotechnical Engineering, 2004, 266: 756-760. (in Chinese) [7] 余常俊. 高速公路加宽工程新老路基结合部施工技术[J]. 公路, 20043:105-108. YU Chang-jun. Highway widening project construction technology of the new and old road in junction[J]. Road, 20043: 105-108. (in Chinese) [8] 胡汉兵,饶锡保,陈 云. 软土地基新老路基搭接的岩土工程问题和处理对策[J]. 岩土力学, 2004,82:321-324. HU Han-bing, RAO Xi-bao, CHEN Yun. Geotechnical problems caused by new embankment splicing with old one on soft ground and treatment measures[J]. Geotechnical Mechanics, 2004, 82 [9] 张蕴杰,凌建明. 软土地区高速公路加宽工程理论与实践[M]. 北京: 人民交通出版社, 2010.ZHANG Yun-jie, LING Jian-ming. Highway widening engineering theory and practice on Soft soil area[M]. Beijing: People's Traffic Press, 2010. (in Chinese) [10] JTGD302004 公路路基设计规范[S]. 北京: 人民交通出版社, 2004. JTGD302004 Specifications for design of highway subgrades[S]. Beijing: People's Traffic Press, 2004.(in Chinese)
|
|
|
|